Home / National / New Air Traffic Control Tower at Tiruchi airport to be ready by March 2025

New Air Traffic Control Tower at Tiruchi airport to be ready by March 2025

The building is being constructed at an estimated cost of ₹60.75 crore; it will have a four-floor technical block as well as an eight-floor Air Traffic Control tower

Share this news

About @click197 - B TELEGRAM BAM 423 751 RUB TINKOFF

Check Also

महाराष्ट्र के हिंगोली में हुई अमित शाह के हेलीकॉप्टर की चेकिंग

मुंबई। चुनाव आयोग की टीम ने शुक्रवार को हिंगोली हेलीपैड पर केंद्रीय गृहमंत्री अमित शाह …